KAKOBUYBUYING DESK
EN
EnglishPolskiEspañol
Build a shortlist

Prioritise a Kakobuy shortlist before placing an order

When your saved finds exceed your budget or your time, check which ones serve a real need and which still depend on missing information.

Make a row for each decision

Record the use, your existing alternative, the next date you would use it, estimated full cost and the evidence still missing. If two items serve the same purpose, put them side by side before adding either to the basket.

Check deal-breakers before scoring

A jacket with no sleeve measurement stays pending if sleeve length is essential. For ready items, score need from 0 to 3, urgency from 0 to 2 and frequency of use from 0 to 2. A replacement belt with 3 + 1 + 2 scores 6. A spare bag with 1 + 0 + 1 scores 2.

Review the highest score against the full cost

With a budget of 45, a fully priced belt at 21 leaves 24. A bag estimated at 29 goes on hold. If buying the belt changes what you would pay for shipping, update the remaining amount. Write the specific action for pending items, such as “confirm sleeve length before paying”.